Tesio Cooling Systems has succeeded in closing a very difficult project.
JST Transformateurs asked us to develop and produce a Cooling System for a transformer to be assembled on a Korean high-speed train.
The technical specifications were very challenging and the requested system development time very strict. An efficient planning and programming system and a precise set of activities scheduling, besides a strong cooperation with the French technical team, assured a production on time and with the requested quality characteristics.
The internal project management system has proved to be strong, mature and so robust to smooth also the most difficult situation.
We thank a lot JST Transformateurs, both as a company that gave us this great opportunity and as well as a French project team that worked with us toward achieving a common success.